Development
Development Project Status
E/ONE Grinder Pump Installation Specifications
This information and related links are intended to be a guide for use in planning, permitting and obtaining occupancy approval for your development. The staff of the Engineering Design & Review section and the Permits office will assist you in this process as well. The Engineering Division is located in the Whitson Administration Building, 1600 Second Avenue North (615-862-4598). The Permits office is in the Metro Office Building, 800 Second Avenue South (615-862-7225).
- Handbooks
- Process Overview Presentations
- Fee Schedules
- Forms/Worksheets/Requirements
- Engineering
- Request for Water/Sewer Availability
- Construction Plan Review Checklist
- Plans Review Fee Worksheet
- Approved Construction Specifications
- Technical Specifications
- Standard Details (Zip format, 51.5 MB)
- Private Sewer Service Policy Detail
- Approved Materials
- Request for Product Consideration
- Fire Hydrant Flow Data Worksheet
- Permits
- Schematics and Details for Backflows, Meters and Taps
- Policies, Procedures and Guidelines
- Policies
- Procedures
- Guidelines
- Customer Owner Fire Hydrant Meters
- Customer Use of MWS Fire Meters
- Backflow Device Placement Variance Request
- MWS Location Services
- Variance Request
- Inspecting Meter/Meter Box Installation
- Relining of Mains
- Mobile Food Service Requirements
- Tap Scheduling
- Water Tap Inspection (4"-6")
- Water Tap Inspection (.75"-1")
- Permitting Meters
- Sewer Tap Inspection (6")
- Backflow Guidelines/Requirements
- Commercial Meter (Basic Guidelines)
- Residential Meter (Basic Guidelines)
- Connection to Force Mains/Grinder Pump
- Policies
- Engineering
- Environmental Compliance
- Industrial Pretreatment
- Grease Management
- Waste Haulers
- Stormwater
- Stormwater Management Manual
- REGULATIONS - Volume 1
- PROCEDURES - Volume 2
- THEORY - Volume 3
- BEST MANAGEMENT PRACTICES (BMP) MANUAL - Volume 4
- Grading Permit
- Drainage and Grading (Plan Management Manual, Vol. 1, Appendix A)
- Grading Pre-construction Meeting Application - Electronic Submission
- Stormwater Checklist (for Development or Demolition Sites That Do Not Require a Grading Permit)
- Project Fee Computation Worksheet
- Stormwater Management Committee
- Variance & Appeal Application and Checklist
Effective December 1, 2007, the filing fee for variance requests and appeal applications is $335.00. - Meeting Protocol Procedures
- Water Quality Buffers
If you have any questions which are not addressed through this web site, please email mary jackson or michael morris.
Questions which are not addressed through this web site, please email Sonia Harvat.