FACILITY PRIORITIZATION LIST AS OF AUGUST 20, 2003
Each group of lines below is information about a specific Metro facility's plan in the transition to
compliance with the Americans with Disabilities Act. Each group contains the following lines:
1. the facility's name and the department(s) of Metro government it houses or serves
2. the cost of bringing the facility into compliace as estimated by the Thomas Miller report
3. the proposed construction date, the date of funding approval, the actual date of completion
4. notes, if any
The information in this document is based on the most current data available to the ADA Compliance
Division.
Courthouse (multi-tenant)
Estimated cost: $2,257,000
Proposed Construction Date May 2003. No funding approval date. No actual completion date.
No notes.
Ben West building (multi-tenant)
Estimated cost: $210,649
Proposed construction dateJuly 2005. No funding approval date. No actual completion date.
No notes.
Lindsley Hall (multi-tenant)
Estimated cost $118,878
Proposed construction date January 2003. No funding approval date. No actual completion date.
No notes.
Howard School (multi-tenant)
Estimated cost $598,014
Proposed construction date July 2004. No funding approval date. No actual completion date
Transition space (old Metro Office Building) to be complete.
Lentz Public Health Center (Health Department)
Estimated cost $720,754
Proposed construction date December 2002. No funding approval date. No actual completion date.
Projected design start date.
Criminal Justice Center (multi-tenant)
Estimated cost $2,150,000
No proposed construction date. No funding approval date. No actual completion date.
No notes.
222 Building (multi-tenant)
Estimated cost $1,125,000
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Centennial Sportsplex (Parks Department)
Estimated cost $850,000
Proposed construction date June 2003. No funding approval date. No actual completion date.
No notes.
Municipal Auditorium (Municipal Auditorium)
Estimated cost $1,400,000
Proposed construction date June 2003. No funding approval date. No actual completion date.
No notes.
Clifford Allen Building (multi-tenant)
Estimated cost $82,396
No proposed construction date. No funding approval date. No actual completion date.
External path of travel rehabbed.
E911 Communications Building (multi-tenant)
Estimated cost $175,970
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Juvenile Justice Center (multi-tenant)
Estimated cost $258,188
Proposed construction date May 2003. No funding approval date. No actual completion date.
No notes.
Market Building (Farmers Market)
Estimated cost $43,332
No proposed construction date. No funding approval date. No actual completion date.
Completed.
Fire Department Headquarters (Fire Department)
Estimated cost $143,548
Proposed construction date Year 5. No funding approval date. No actual completion date.
No notes.
Ambulance Center (Fire Department)
Estimated cost $86,210
Proposed construction date Year 1. No funding approval date. No actual completion date.
Relocated.
Fire Academy (Fire Department)
Estimated cost $127,633
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Fire Prevention Bureau (Fire Department)
Estimated cost $112,540
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Engine Company 14 inc. Com House (Fire Department)
Estimated cost $265,328
No proposed construction date. No funding approval date. No actual completion date.
Replace.
Engine Company 15, was 22's (Fire Department)
Estimated cost $67,244
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 22, was 15's (Fire Department)
Estimated cost $69,498
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 01 (Fire Department)
Estimated cost $60,618
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 03 (Fire Department)
Estimated cost $62,296
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 04 (Fire Department)
Estimated cost $60,886.
Proposed onstruction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 06 (Fire Department)
Estimated cost $75,390
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 08 (Fire Department)
Estimated cost $54, 656
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 09 (Engine Company 05) (Fire Department)
Estimated cost $57,906
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Engine Company 10 - New. (Fire Department)
Estimated Cost $61,598
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 11 (Fire Department)
Estimated cost $57,262
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 12 (Fire Department)
Estimated cost $69,172
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 13 (Fire Department)
Estimated cost $67,146
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 16 (Fire Department)
Estimated cost $48,730
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Engine Company 17 (Fire Department)
Estimated cost $66,496
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 18 (Fire Department)
Estimated cost $61,466
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Comany 19 1-A-AM (Fire Department)
Estimated cost $85,784
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 20 (Fire Department)
Estimated cost $83,706
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 21 (Fire Department)
Estimated cost $69,210
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 23 (Fire Department)
Estimated cost $68,106
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 24 (Fire Department)
Estimated cost 63,482
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 25 (Fire Department)
Estimated cost $54,664
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 26 (Fire Department)
Estimated cost $60,806
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 27 (Fire Department)
Estimated cost $78,926
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 28 (Fire Department)
Estimated cost $59,738
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 29 (Fire Department)
Estimated cost 61,628
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 30 (Fire Department)
Estimated cost $48,132
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 31 (Fire Department)
Estimated cost $53,284
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 32 (Fire Department)
Estimated cost $48,522
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Engine Company 33 and 35 (Fire Department)
Estimated cost $62,426
Proposed construction date Year 1 and 2. No funding approval date. No actual completion date.
No notes.
Engine Company 34 (Fire Department)
Estimated cost $53,108
Proposed construction date Year 3. No funding approval date. No actual completion date.
No notes.
Engine Company 36 (Fire Department)
Estimated cost $53,574
Proposed construction date Year 2. No funding approval date. No actual completion date.
No notes.
Engine Company 37 (Fire Department)
Estimated cost $89,382
Proposed construction date Year 1. No funding approval date. No actual completion date.
No notes.
Clinic Pharacy - Leased (Health Department)
Estimated cost $59,890
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Downtown Service Center (Health Department)
Estimated cost $207,116
Proposed construction date December 2006. No funding approval date. No actual completion date.
Projected design start date.
Nutrition Program (Health Department)
Estimated cost $46,955
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Supplemental Food Warehouse (Health Department)
Estimated cost $71,461
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Tarbox School - Leased Senior Cit. (Health Department)
Estimated cost $262,039
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Downtown Clinic (Health Department)
Estimated cost $97,148
No proposed construction date. No funding approval date. No actual completion date.
No notes.
East Public Health Center (Health Department)
Estimated cost $224,792
Proposed construction date December 2006. No funding approval date. No actual completion date.
Project design start date.
Woodbine Public Health (Health Department)
Estimated cost $124,272
No proposed construction date. No funding approval date. No actual completion date.
Report recommended to move out of this location.
Head Start Parent Training Center (Metro Action Commission)
Estimated cost $73,350
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Dudley Head Start Center (Metro Action Commission)
Estimated cost $115,160
Proposed start date 2004. No funding approval date. No actual completion date.
No notes.
East Head Start Center (Metro Action Commission)
Estimated cost $50,776
No proposed construction date. No funding approval date. No actual completion date.
To be taken out of service 2004.
MAC Administrative Office (Metro Action Commission)
Estimated cost $483,490
Proposed construction date 2007. No funding approval date. No actual completion date.
No notes.
Richland Head Start Center (Metro Action Commission)
Estimated cost $105,734
Proposed construction date 2005. No funding approval date. No actual completion date.
No notes.
Ross Head Start Center (Metro Action Commission)
Estimated cost $531,522
Proposed construction date 2006. No funding approval date. No actual completion date.
No notes.
Tom Joy Head Start Center (Metro Action Commission)
Estimated cost $233,944
Proposed construction date 2002. No funding approval date. No actual completion date.
Complete except playground.
Woodbine Head Start Center (Metro Action Commission)
Estimated cost $80,656
No proposed construction date. No funding approval date. No actual completion date.
To be taken out of service 2004.
Deaderick Street Transit Mall (Metro Transit Authority)
Estimated cost $12,500
No proposed construction date. No funding approval date. No actual completion date.
Rehab work to meet program access requirements determined by current MTA ADA audit.
Metropolitan Transit Authority (Metro Trainsit Authority)
Estimated cost $100,033
No proposed construction date. No funding approval date. No actual completion date.
Rehab work to meet program access requirements determined by current MTA ADA audit.
Nashville Convention Center (Nashville Convention Center)
Estimated cost $253,051
Proposed construction date December 2002. No funding approval date. No actual completion date.
To be completed 2003. Design underway, construction begins 12/02.
Antioch Community Center (Parks Department)
Estimated cost $35,218
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Bellevue Community Center (Parks Department)
Estimated cost $190,576
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Bellevue Park - 5 (Parks Department)
Estimated cost $18,100
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Bordeaux Gardens Park - 1 (Parks Department)
Estimated cost $5,800
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Buena Vista Park - 2 (Parks Department)
Estimated cost $1,920
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Cane Ridge Park - 6 (Parks Department)
Estimated cost $99,660
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Cecil Rhea Crawford Park - 1 (Parks Department)
Estimated cost $23,730
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Cedar Hill Park - 9 (Parks Department)
Estimated cost $66,580
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Centennial Park - 11 (Parks Department)
Estimated cost $418,070
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Charlotte Park - 1 (Parks Department)
Estimated cost $31,000
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehavilitation included in Master Plan.
Cleveland Community Center (Parks Department)
Estimated cost $$106,332
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Cleveland Park - 2 (Parks Department)
Estimated cost $25,920
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Clinton B. Fisk Park - 2 (Parks Department)
Estimated cost $24,680
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Coleman Community Center (Parks Department)
Estimated cost $135,046
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Coleman Park (Parks Department)
Estimated cost $9,700
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation indluded in Master Plan.
Concessions (Parks Department)
Estimated cost $32,800
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Douglas Center (Parks Department)
Estimated cost $88,266
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Dudley Park - 2 (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
E. S. Rose Community Center & [sic: as on orginal] (Parks Department)
Estimated cost $147,442
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
E. S. Rose Park - 3 (Parks Department)
Estimated cost $176,500
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
East Park Community Center (Parks Department)
Estimated cost $88,354
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Eastland Park -1 (Parks Department)
Estimated cost $30,150
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Edwin Warner Park - 28 (Parks Department)
Estimated cost $28,830
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Elizabeth Community Center (Parks Department)
Estimated cost $46,248
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Elmington Park - 1 (Parks Department)
Estimated cost $2,000
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Ezell Road Park (Parks Department)
Estimated cost $23,830
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Fannie Mae Dees Park - 4 (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Glencliff High School - 2 (Parks Department)
Estimated cost $35,270
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Granberry Park -1 (Parks Department)
Estimated cost $4,000
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Green Hills Park - 1 (Parks Department)
Estimated cost $94,830
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
H. G. Hill Park - 2 (Parks Department)
Estimated cost $2,660
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Hadley Park - 5 (Parks Department)
Estimated cost $70,340
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Hadley Park Community Center (Parks Department)
Estimated cost $84,076
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Hamilton Creek Park - 3 (Parks Department)
Estimated cost $52,375
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Hartman Park - 3 (Parks Department)
Estimated cost $28,980
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Hope Gardens Park - 1 (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Joelton Park - 4 (Parks Department)
Estimated cost $68,280
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Kirkpatrick Community Ceneter (Parks Department)
Estimated cost $52,642
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Lock Two Park - 1 (Parks Department)
Estimated cost $11,800
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Madison Community Center (Parks Department)
Estimated cost $88,892
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Madison Park (Parks Department)
Estimated cost $4,130
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
McCabe Community Center (Parks Department)
Estimated cost $65,056
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
McCabe Park - 7 (Parks Department)
Estimated cost $18,150
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
McFerrin Community Center (Parks Department)
Estimated cost $65,898
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
McKissak Park - 1 (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Metro Parks Headquarters Conference Room (Parks Department)
Estimated cost $70,170
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Mill Creek Greenway - 1 (Parks Department)
Estimated cost $2,500
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Morgan Community Center (Parks Department)
Estimated cost $60,596
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Napier Community Center (Parks Department)
Estimated cost $80,890
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Old MTA Building (Parks Department)
Estimated cost $125,838
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Paragon Mills Park - 1 (Parks Department)
Estimated cost $30,500
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Parmer Park - 1 (Parks Department)
Estimated cost $15,310
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Percy Warner Park (Parks Department)
Estimated cost $145,700
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Picnic Gazebo (Parks Department)
Estimated cost $4,000
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Pitts Park - 1 (Parks Department)
Estimated cost $22,480
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
R. H. Boyd Community Center
Estimated cost $62,416
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
R. H. Boyd - Preston Taylor Park - 1 (Parks Department)
Estimated cost $1,920
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Reservoir - Head Start & Res. Park (Parks Department)
Estimated cost $92,934
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Reservoir Park - 4 (Parks Department)
Estimated cost $174,000
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Rhodes Park - 7 (Parks Department)
Estimated cost $116,800
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Richard Hartman Park (Parks Department)
Estimated cost $62,820
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Richland Park - 2 (Parks Department)
Estimated cost $7,200
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Riverfront Park - 12 (Parks Department)
Estimated cost $107,740
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Seven Oak Park - 4 (Parks Department)
Estimated cost $71,480
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Sevier Community Center & Park (Parks Department)
Estimated cost $116,374
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Shelby Bottoms - 2 (Parks Department)
Estimated cost $630
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Shelby Community Center (Parks Department)
Estimated cost $63,476
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Shelby Park - 23 (Parks Department)
Estimated cost $63,476
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Shelby Walk - 1 (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
South Inglewood Community Center (Parks Department)
Estimated cost $54,636
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
South Inglewood Park - 2 (Parks Department)
Estmated cost $85,050
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Tom Joy Park - 1 (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Tony Rose Park (Parks Department)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Two Rivers Mansion (Parks Department)
Estimated cost $104,200
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Two Rivers Park - 19 (Parks Department)
Estimated cost $181,620
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Warner Parks (Parks Department)
Estimated cost $54,566
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Watkins Community Center (Parks Department)
Estimated cost $136,146
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Watkins Park - 1 (Parks Department)
Estimated cost $3,500
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
West Park - 2 (Parks Department)
Estimated cost $31,420
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
West Park Community Center (Parks Department)
Estimated cost $59,370
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
White's Creek School - Park - 2 (Parks Department)
Estimated cost $33,540
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Whitfield Park - 1 (Parks Department)
Estimated cost $32,800
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Z. Alexander Looby Community Ceneter (Parks Department)
Estimated cost $124,420
No proposed construction date. No funding approval date. No actual completion date.
Total Parks facility rehabilitation included in Master Plan.
Central Sector Station (Police Department)
Estimated cost $46,714
No proposed construction date. No funding approval date. No actual completion date.
To be included in facility master plan.
East Sector Station (Police Department)
Estimated cost $4,984
No proposed construction date. No funding approval date. No actual completion date.
To be included in facility master plan.
Police Academy (Police Department)
Estimated cost $179,106
No proposed construction date. No funding approval date. No actual completion date.
To be included in facility master plan.
South Precinct (Police Department)
Estimated cost $35,742
No proposed construction date. No funding approval date. No actual completion date.
To be included in facility master plan.
Vehicle Impound (Police Department)
Estimated cost $25,830
No proposed construction date. No funding approval date. No actual completion date.
To be included in facility master plan.
West Sector Station (Police Department)
Estimated cost $48,322
No proposed construction date. No funding approval date. No actual completion date.
To be included in facility master plan.
New Libraries - Program accessibility of library services has been achieved through
rehabilitation of neighborhood libraries and greatly enhanced by construction of five
new libraries. Four new libraries completed in 2000 provided 100% accessible
facilities in the four quadrants of the city. The completion of the new main library
downtown in 2001 provides an accessible building in the central city.
Bellevue Library (Public Library)
Estimated cost $27,960
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Carnegie North Library (Public Library)
Estimated cost $102,570
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Donelson Library (Public Library)
Estimated cost $30,960
No proposed construction date. No funding approval date. No actual completion date.
No notes.
East Library (Public Library)
Estimated cost $70,426
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Edgehill Library (Public Library)
Estimated cost $45,470
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Goodlettsville Library (Public Library)
Estimated cost $75,200
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Green Hills Branch (Public Library)
Estimated cost $41,461
No proposed construction date. No funding approval date. No actual completion date.
Replaced.
Hadley Park Library (Public Library)
Estimated cost $76,440
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Inglewood Library (Public Library)
Estimated cost $34,900
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Mary & Charles Pruitt Library (Public Library)
Estimated cost $76,747
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Old Hickory Library (Public Library)
Estimated cost $35,470
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Richland Park Library (Public Library)
Estimated cost $41,380
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Southeast Library (Public Library)
Estimated cost $35,360
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Thompson Lane Library (Public Library)
Estimated cost $32,070
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Administrative Building/Main Center (Public Works)
Estimated cost $244,405
No proposed construction date. No funding approval date. No actual completion date.
No notes.
East Service Center (Public Works)
Estimated cost $154,547
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Engineering Building (Public Works)
Estimated cost $62,580
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Special Operations (Public Works)
Estimated cost $84,068
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Staff Services Building (Public Works)
Estimated cost $72,630
No proposed construction date. No funding approval date. No actual completion date.
No notes.
West Service Center (Public Works)
Estimated cost $65,393
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Community Services Building (Sheriff's Office)
Estimated cost $65,978
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Day Reporting Center (Sheriff's Office)
Estimated cost $252,910
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Hill Detention Center/Administrative Offices (Sheriff's Office)
Estimated cost $313,686
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Metro Davidson County Detention Facility (Sheriff's Office)
Estimated cost $386,616
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Sheriff's Training Academy (Sheriff's Office)
Estimated cost $347,444
No proposed construction date. No funding approval date. No actual completion date.
Some rehab completed in 2001-2002.
Knowles Home (Social Services)
Estimated Cost $665,616
No proposed construction date. No funding approval date. No actual completion date.
All rehab completed except in patient rooms.
Randall's Learning Center (Social Services)
Estimated cost $401,644
No proposed construction date. No funding approval date. No actual completion date.
BOE facility to be included.
Richland Village (Social Services)
Estimated cost $916,196
No proposed construction date. No funding approval date. No actual completion date.
Continued use of facility not decided.
Tennessee State Fairgrounds - Money has been budgeted for 2003 to improve accessible
pedestrian route.
Additional Restrooms at Gate (Tennessee State Fairgrounds)
Estimated cost $1,620
No proposed construction date. No funding approval date. No actual completion date.
Undetermined at continued use.
Agricultural Building (Tennessee State Fairgrounds)
Estimated cost $4,920
No proposed construction date. No funding approval date. No actual completion date.
Complete except visual alarms, phone, and concessions.
Annex Buiding (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Complete except visual alarms, phone, and concessions.
Banquet Hall North of Tunnel (Tennessee State Fairgrounds)
Estimated cost $4,450
No proposed construction date. No funding approval date. No actual completion date.
To be included in lease agreement.
Cafeteria - Restaurant (Tennessee State Fairgrounds)
Estimated cost $19,140
No proposed construction date. No funding approval date. No actual completion date.
To be included in lease agreement.
Cattle Barn and Judging Area (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Cider Shed - Hoot Owl Junction (Tennessee State Fairgrounds)
Estimated cost $2,650
No proposed construction date. No funding approval date. No actual completion date.
Out of service.
Concessions State Building (Tennesseee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
Out of service.
Creative Arts Building - Women's Building (Tennessee State Fairgrounds)
Estimated cost $6,450
No proposed construction date. No funding approval date. No actual completion date.
Complete with the exception of visual alarms.
Dairy Barn - Cattle (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Exhibitors Building (Tennessee State Fairgrounds)
Estimated cost $4,280
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Fair Board / Speedway Office Building (Tennessee State Fairgrounds)
Estimated cost $290,480
Proposed construction date 2003. No funding approval date. No actual completion date.
Elevator budgeted for 2003.
Fair Park Office Building & Restrooms (Tennessee State Fairgounds)
Estimated cost $18,100
No proposed construction date. No funding approval date. No actual completion date.
Rehabbed bathrooms. No programs on upper level.
Grandstand Facility (Tennessee State Fairgrounds)
Estimated cost $949,700
No proposed construction date. No funding approval date. No actual completion date.
To be addressed through lease in 2003.
Hoot Owl Junction (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Livestock Building - Cattle Barn C-Z (Tennesssee State Fairgrounds)
Estimated cost $660
Proposed start 2003. funding approval date. No actual completion date.
Repave.
Log Cabin - Hoot Owl Junction (Tennessee State Fairgrounds)
Estimated cost $2,650
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Milking Parlor (Tennessee State Fairgrounds)
Estimated cost $1,450
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Mule Barn, Fences, Etc. (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Mule Shed - Hoot Owl Junction (Tennessee State Fairgrounds)
Estimated cost $2,650
No proposed construction date. No funding approval date. No actual completion date.
Closed at this time.
One Story Metal Swine Barn - S-1 (Tennessee State Fairgrounds)
Estimated cost $660
Proposed construction date 2003. No funding approval date. No actual completion date
Accessible pedestrian route.
Rabbit and Poultry Barn (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Smoke House - Hoot Owl Junction (Tennessee State Fairgrounds)
Estimated cost $2,650
No proposed construction date. No funding approval date. No actual completion date.
Closed at this time.
Sorghum Mill Building (Tennessee State Fairgrounds)
Estimated cost $5,800
No proposed construction date. No funding approval date. No actual completion date.
Closed at this time.
Sports Arena (Tennessee State Fairgrounds)
Estimated cost $76,140
No proposed construction date. No funding approval date. No actual completion date.
Outstanding concessions, alarms, and phones.
Ticket Booths (Tennessee State Fairgrounds)
Estimated cost $0
No proposed construction date. No funding approval date. No actual completion date.
New accessible booths purchased.
Vaughan Building (Tennessee State Fairgrounds)
Estimated cost $4,490
No proposed construction date. No funding approval date. No actual completion date.
No notes.
Wilson Hall (Tennessee State Fairgrounds)
Estimated cost $4,110
No proposed construction date. No funding approval date. No actual completion date.
Completed except visual alarms, telephones, and concessions.
Grand Total: $25,386,995
End of document.