View the weekly construction activities report.
Bridge Projects
The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) maintains 353 Federally regulated bridges and 52 underpasses, plus 2 pedestrian bridges and underpasses, totaling 407 structures.
In Progress
- Craighead Street Bridge Maintenance Project: Beginning Thursday, November 13, the two outside lanes of Craighead Street will be closed. Crews will begin with Phase 2 of the traffic control plan. Phase 2 of the project is estimated to last two weeks, weather permitting. The entire project is expected to last one month and the road will remain open trhoughout the duration of the project.
- Great Circle Road Bridge (Metro Center)
Culvert Projects
The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) performs maintenance, reconstruction, and addresses the vulnerability concerns of more than 3,500 culverts within the Metro right-of-way.
Report a Clogged Culvert and Cross Drain
Guardrail Program
The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) maintains approximately 4,500 guardrails to current Tennessee Department of Transportation (TDOT) standards, with the purpose of ensuring the traveling public’s safety by reducing the severity of roadway departures. The NDOT Guardrail Program investigates, inspects, surveys, designs, and documents all guardrail projects.
Request for a new guardrail to be installed, repaired, or removed on a Metro roadway.