Project Limits
Gallatin Pike from One Mile Parkway to Welworth Street
Council District 9 and 10: Council Member Tonya Hancock and Council Member Jennifer Frensley Webb
Project Description
Status: 90% Design Phase
The project team revised the 60% design plans and will be presenting the 90% design plans at a scheduled meeting on Tuesday, January 6, 2026.
This project will bridge multiple sidewalk gaps along Gallatin Pike, improving walkability and pedestrian safety by providing safe connections to neighborhoods and destinations for transportation and recreation.
The estimated construction start date is to be determined (TBD).
Vision Zero
This project is located on Gallatin Pike, which is one of the most dangerous streets for pedestrians, cyclists, and motorists alike, according to the Vision Zero Action Plan. The segment of Gallatin Pike from One Mile Parkway to Welworth St. is included in the Top 100 Priority Project list in the Vision Zero Implementation Plan.
WalknBike
This project is intended to bridge sidewalk gaps as part of the Priority Sidewalk Network identified in the 2022 WalknBike plan. Projects were prioritized by four critical needs safety, connectivity, access to transit, and health and equity on a scale of 100 points.
This project was included in the workplan for 2023-2024.
Community Engagement